69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity

Weirton, WV

Building & Construction

69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity

Asking price

N/A

Cash flow (TTM)

Private

Released after NDA

Revenue (TTM)

Private

Released after NDA

Inventory

Private

Released after NDA

EBITDA (TTM)

Private

Released after NDA

ScoutSights · Computed insights

The narrative

A look inside 69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity.

This Project presents a rare opportunity to acquire a fully infrastructure-loaded legacy steel campus in Weirton, West Virginia, situated along the Ohio River in the heart of the Upper Ohio Valley. The site features over 3.3 million square feet of industrial buildings, six electrical substations, a fully operational water and wastewater treatment plant, on-site natural gas delivery via TC Energy, comprehensive rail access, and an established inventory of spare parts and equipment. Unlike most brownfield redevelopment opportunities, Weirton's existing infrastructure dramatically reduces the capital investment required to bring a new industrial user online. Environmental risks are actively managed through site management planning, targeted demolition, and established regulatory frameworks. The site's scale, infrastructure depth, and trimodal access make it well-suited for advanced manufacturing, data center development, energy transition, logistics, or mixed industrial use. On-Site Power 69MW Behind the Meter - Power Generation with Approximate Date for In Service: Up to 1.0 GW for "behind the meter" power generation with an in service date of 24-32 months depending on the site development Phase I could be an initial "behind the meter" power with Phase II being the ramp up to 1.0GW or higher. Hyperscale's are looking for 1GM of power "behind the meter" in 36 months. Total Power from Grid Connection: 300MW Electric Provider: FirstEnergy (MonPower) Six on-site electrical substations - one installed within the past three years Monthly maintenance and inspections have been maintained since plant idling; substations confirmed in good condition by FirstEnergy Replacement cost of substations and transformers estimated to exceed $100 million FirstEnergy has confirmed readiness to advance to DLS and ESA phases, pending end-user power timeline Buildings & Facilities Warehouse building: 3 million sq ft under roof - excellent structural condition with full utility connections Ceilings: 25-27 ft throughout; robust concrete foundations and high-quality concrete flooring Two additional buildings, each approximately 1 million sq ft, located along the main street - suitable for repurposing Additional structures feature exceptionally high ceilings, powered shells, and substantial concrete foundations Portions of the warehouse are currently leased, generating ongoing revenue Water 01 Process/ Municipal Water Fully operational on-site water/wastewater treatment plant with multiple clarifiers 02 Municipal Integration Facility supplements the city water supply during shortages via connection to the municipal water system 03 Wastewater Treatment On-site plant serves both the campus and municipal needs; replacement cost exceeds $200 million Fiber Established fiber infrastructure on-site as part of a comprehensive municipal utility network Connectivity supports industrial controls, data infrastructure, and broadband buildout Natural Gas Infrastructure Provider: TC Energy TC Energy 16" pipeline feeds the Strip Mill via a regulation and measurement facility; natural gas pipeline follows the FirstEnergy powerline into the site TC Energy 16" pipeline also feeds the Halfmoon Warehouse via a regulation and measurement facility - the same pipeline as the Strip Mill. Single feed pipeline serving both facilities at 225 psig MOP Capacity: 50 Dth (dekatherms) per day - robust compared to typical industrial sites Environmental Next Steps Environmental requirements and site management plans will be revised upon completion of the redevelopment design and engineering. Demolition of non-repurposable buildings is expected to reduce environmental liabilities per preliminary site management assessments The redevelopment strategy incorporates eliminating legacy environmental concerns and achieving full regulatory compliance. Brownfield designation provides opportunities for remediation incentives and streamlined development pathways Asset Summary Scrap value: $28M-$35M (tin, copper, and high-value steel) Spare parts inventory (electric motors, pumps, components): estimated value over $3 million Railroad infrastructure: direct access to Norfolk Southern; estimated value $4-$6 million - transferred with site On-site vehicles and equipment (trucks, vans, tow motors, rail tugs): estimated value $100,000-$200,000 Water/wastewater treatment plant replacement cost: exceeds $200 million Electrical substation replacement cost: exceeds $100 million Railroad Infrastructure Substantial short lines and rail connectors on-site, providing direct access to the Norfolk Southern mainline Norfolk Southern has made recent inquiries regarding asset acquisition - estimated value $4-$6 million. Railroad assets transfer with the property; the buyer determines optimal use or Rail ownership enhances logistical capabilities and site attractiveness to prospective operators

The fine print

Detailed information.

IndustryBuilding & Construction
Real estateLeased
LocationWeirton, WV
Year establishedNot disclosed
Lease expirationNot disclosed
Monthly rentNot disclosed
FF&ENot disclosed
Growth & expansionNot disclosed
Support & trainingNot disclosed

BizScout Score

How this listing scores against everything else on BizScout.

An at-a-glance read on listing quality. Higher means the deal is well-priced, the financials look healthy, and the data is well-documented. A low score often means the seller hasn’t shared enough data yet, not that the deal is bad.

BizScout Score
0 · Poor50 · Fair75 · Good100 · Excellent

Why this score?

Historical comps

How this asking price compares.

Compare this listing against same-industry asking prices in the BizScout listings database — peer percentiles, sector asking-price multiples, and the 18-month asking-price trend.

Recent comparable sales

Industry context

The industry this business sits in.

Size, momentum, structure, and where the risk concentrates.

Location & catchment

Weirton, WV

Reference data sourced from Census ACS, Census County Business Patterns, and NOAA Climate Normals. Exact address shared after NDA.

Why this deal stands out

The case for this acquisition.

Scannable cards on owner involvement, asset transfer, revenue quality, and other deal-shaping signals pulled from this listing.

Take the first step

One form away from connecting with the seller.

Your details go straight to the seller’s representative, and the conversation stays organized in one place on BizScout.

Free BizScout account — takes a minute

Radar

More like this, every morning.

Radar scans thousands of listings across the web every day and emails you the ones that fit what you’re looking for.

Interested in this business?

Sign up free to get complete financial details, seller information, and contact the owner directly through BizScout.

Asking price

N/A

View on BizScout